CARE VISITS THE CONSTRUCTION SITE OF THE FUTURE NHIÊU LỘC – THỊ NGHÈ WASTEWATER TREATMENT PLANT
Originally posted: 31/10/2026
On Saturday, October 31, 2026, researchers from IJL CARE – Ho Chi Minh City University of Technology (HCMUT) visited the construction site of the future Nhiêu Lộc – Thị Nghè wastewater treatment plant in Thủ Đức, Ho Chi Minh City.
Once in operation, the plant will treat 480,000 m³ of wastewater per day, corresponding to the discharge of more than one million residents of the Nhiêu Lộc – Thị Nghè canal basin and part of the former District 2.
During the visit, the VINCI Construction Grands Projets teams presented the organization of the construction site as well as the entire treatment line, from pumping to disinfection, including biological treatment using moving bed biofilm reactors (MBBR), sludge treatment and odor treatment.
For the future engineers of the PFIEV program (Programme de Formation d’Ingénieurs d’Excellence au Vietnam) at HCMUT, a plant of this scale opens up real career prospects in the design and operation of sanitation infrastructure. For the city, it will significantly increase the volume of wastewater collected and treated before being discharged into the Saigon River, thereby improving the water quality of the canal and the river.
CARE sincerely thanks VINCI Construction Grands Projets for their warm welcome.

Figure 1. Construction site of the future Nhiêu Lộc – Thị Nghè wastewater treatment plant in Thủ Đức, Ho Chi Minh City.

